Our contractor has been building our garden shed for a couple of weeks. He is building this for us as a side job so he can only work on it a couple of nights a week, weather permitting. The first step was to build the frame for the floor.
Next he put in the floor and built the frame for the ramp.
Several steps went by before I got back out with the camera. Now the siding is on, the roof is ready for the shingles, and the door and windows are framed.
The roof, siding, windows and door are installed.
The next step is to paint the outside to match the house, put a non-skid surface on the ramp and place gravel around the base.