Lonnie, our tile guy came back last week and used either 12"x12" sheets or 1/2 sheets, filling in as much space as possible around the stream.
Now, Susan is removing rocks from the backing material and placing the rocks in the best position based on size and color. Once all the rocks are in place, Lonnie will grout all around the rocks.
We will then remove the cardboard outline of the stream and begin building the stream with crystal blue fire rocks.
Saturday, February 21, 2015
Thursday, February 12, 2015
Blinds
The blinds on these two windows are hand operated. No remotes or cords were required because the blinds are easy to reach.
Ben installed the TV this week. The TV can be tipped, turned and extended out from the wall. We will have Dish connect this TV to our current coverage and we will add an external DVD player for exercise videos. The blind on the window next to the TV requires a cord to operate. Unfortunately, the blind for the final window did not arrive with the rest of them. This blind requires a remote to operate so we won't have to climb up on the decking every time we want to change the blind setting.
New Liner and Decking
The new liner went in just fine. We left the pool alone for five days, figuring that if there was going to be a problem it should show up in that amount of time. No leaks - YEA!
Empty Pool
After the torn seam was discovered, Ben and Bob took the pool apart and disconnected all the hydraulic lines.
After the torn seam was discovered, Ben drained the remaining water and removed all of the pool components.
The benches, treadmill,step, etc. all had to be removed to get the liner out. Additionally, all the hydraulic lines had to be cut and capped so we would not waste all the hydraulic fluid that was in the lines.
It took about two weeks for the new liner to arrive. Then it had to sit in the bottom of the pool for three days to warm up, which makes it much more pliable to work with.
Subscribe to: