Empty Pool

After the torn seam was discovered, Ben and Bob took the pool apart and disconnected all the hydraulic lines.
After the torn seam was discovered, Ben drained the remaining water and removed all of the pool components.

The benches, treadmill,step, etc. all had to be removed to get the liner out. Additionally, all the hydraulic lines had to be cut and capped so we would not waste all the hydraulic fluid that was in the lines.
It took about two weeks for the new liner to arrive. Then it had to sit in the bottom of the pool for three days to warm up, which makes it much more pliable to work with.