It didn't take very long for us to encounter our first major 'bump in the road' as far as our property development is concerned. Right after our contractor put up the flags, a septic contractor came out to the property to map out the septic system and he discovered a major problem. New building sites, utilizing a septic system, must have a reserve area set aside in case the original drain field fails. The reserve drain field is subject to the same building restrictions as the primary drain field. Because a large amount of our property is designated as wetlands, the septic contractor has told us that there isn't enough land left to support our home, garage and shop. Susan and I have a meeting scheduled with both contractors to discuss possible options. More to follow.....