Things were at a standstill since last Thursday while we were waiting for three different inspections. Once those were out of the way, insulation was installed as were the remaining windows.
The door that opens to the backyard was installed yesterday. Susan and I went shopping and purchased the ceiling fan, the light for the pump room and the exterior light by the door. We had told Ben that we did not need a light on the outside of the building but then we learned it is required by code so now we have a light outside by the door.
This is the inside of the pump room. Next up, for the inside, is wallboard. We are having a special wallboard installed that repels moisture. The interior paint is also a special mix that repels moisture.
Bob and Ben started working on exterior siding today. The weather is cooperating nicely, with temperatures in the mid-80's this week.