Today, Ron, Kevin and Dusty poured the concrete floor. The pump room will end up with concrete for the floor, while the rest of the addition will be covered with tile. Click on a picture to enlarge it and to click through the slide show.
The guys had to move the frame for the dehumidifier unit to get the truck closer to the addition floor. Here, Ron is putting the frame back in place so they can pour the concrete for the pad that will hold the dehumidifier unit.
The bottom of the pool area required grinding to get the concrete smooth enough to avoid tearing the liner.
The trusses were also delivered today. Ben, our contractor will lay out the design on Monday and begin framing on Tuesday, September 9.