There has been a lot of activity on the pool project from the latter part of last week through today. The following two photos show that the coping all around the top of the pool is installed.


Now it is time to installed the pool liner. Two layers of padding have been placed between the floor and the liner for comfort.


These next couple of images show the liner being unfolded then tucked into the rails under the coping.



Now for the hard part. The liner is quite heavy but it still needs to be gently pushed and pulled until it lies flat on all surfaces. This image shows the guys still have some work to do until the liner is in the correct position.  


This is the water propulsion unit. It creates a current so you can swim in place.


The first picture of the underwater treadmill.


The floor is also being installed this week.  Tillie gets away from us every now and again and runs into the pool room to see if she can help.
.

Cutting the tile squares.



The conclusion of the first days work on installing tile.  