Friday, August 8, 2014

Excavation Day 2

The guys were back at work this morning to finish digging the trenches for the first concrete pour, which will take place early next week.

The grass area outside the fence is on the east side of the property. The break in the trench on the east side is for the drain system.

It was interesting to learn how they make sure that all trenches are at the same depth. Concrete will be poured three different times during the project. First, the footing is poured, followed by the foundation and finally the concrete floor.