Today the guys put up the frame for the foundation.
Now that the frame has been built, the foundation can be poured.
Once the foundation has been poured and the concrete dries, the frame will be removed and the area around the frame will be backfilled. Then the propane line will be relocated so it does not lie under the new addition.
0 comments:
Post a Comment